Streamlining the digital economy requires boldness, agility and vision of the future. The deployment of the EllaLink Submarine Optical Fiber Cable is indeed another strong bet in strengthening connectivity, cybersecurity and for building the strategic vision to accelerate Cabo Verde's digital transformation.
The mooring of the EllaLink took place on the morning of February 18, 2021, in the city of Praia, more precisely, at Prainha do Portinho (Achada Grande TrĂ¡s).
This project, which NOSi, alongside all the partners, especially CVTelecom, were bound by a common will, to make a state-of-the-art fiber optic submarine cable with a capacity of 30TB, designed to meet traffic needs between Europe and Latin America, with the possibility of including traffic from the ECOWAS region, starting in Cape Verde.
Furthermore, EllaLink will contribute to accelerate the implementation of the 5G technology standard in the country.